Scheduling multi-operational tasks on nonidentical machines as a time- optimal control problem
From MaRDI portal
Publication:1162438
DOI10.1016/0377-2217(82)90157-6zbMath0481.90044OpenAlexW2038589836MaRDI QIDQ1162438
Publication date: 1982
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(82)90157-6
discrete controltime-optimal control problemfree terminal timefixed final stateminimal completion time for all tasksmixed-integer control variablesnonidentical machinesscheduling multi-operational taskssingle pass scheduling algorithm
Related Items (2)
Modelling and scheduling a batch-type production on identical machines ⋮ Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length
Cites Work
This page was built for publication: Scheduling multi-operational tasks on nonidentical machines as a time- optimal control problem