Structural properties of optimal tool replacement policy in a machining center
From MaRDI portal
(Redirected from Publication:1197900)
Recommendations
- scientific article; zbMATH DE number 37327
- Optimal solutions for the machining economics problem with stochastically distributed tool lives
- scientific article; zbMATH DE number 1541306
- Machining economics with phase-type distributed tool lives and periodic maintenance control
- scientific article; zbMATH DE number 1191195
Cites work
- scientific article; zbMATH DE number 3574704 (Why is no real title available?)
- scientific article; zbMATH DE number 3215084 (Why is no real title available?)
- scientific article; zbMATH DE number 3338194 (Why is no real title available?)
- Finite state Markovian decision processes
- Monotone optimal preventive maintenance policies for stochastically failing equipment
- Negatively isotone optimal policies for random walk type Markov decision processes
- OPTIMAL REPLACEMENT POLICY FOR TWO-UNIT SYSTEM
- Optimal Replacement Rules when Changes of State are Semi-Markovian
- Preventive replacement for multi-parts systems
- The Functional Equations of Undiscounted Markov Renewal Programming
Cited in
(11)- A feeder replenishment policy for a turret-head placement machine
- Determining optimal replacement time for metal cutting tools
- Tool replacement policy for one-sided processes with low fraction defective
- Optimal tool replacement for processes with low fraction defective
- Machining economics with phase-type distributed tool lives and periodic maintenance control
- Optimality Regions and Penalty Analysis of the Parameter Space for Machine Replacement Problems
- A stochastic model for a machining cell with tool failure and tool replacement considerations
- scientific article; zbMATH DE number 1541306 (Why is no real title available?)
- scientific article; zbMATH DE number 37327 (Why is no real title available?)
- Design of tool magazine and operational areas for a multi-tool machine
- Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies
This page was built for publication: Structural properties of optimal tool replacement policy in a machining center
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1197900)