Comparative study of dynamic lot sizing heuristics with backlogging
From MaRDI portal
Publication:1200833
DOI10.1016/0305-0548(92)90069-HzbMath0757.90017OpenAlexW1984367069MaRDI QIDQ1200833
Kim Fung Lam, Eng Ung Choo, Harry Hsieh
Publication date: 16 January 1993
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(92)90069-h
Related Items (3)
Lot-sizing heuristics for continuous time-varying demand and shortages ⋮ Extensions of simple eyeballing dynamic lot sizing heuristics. ⋮ Lot sizing and scheduling -- survey and extensions
Cites Work
- Two-way eyeballing heuristics in dynamic lot sizing with backlogging
- Eyeballing heuristics for dynamic lot size problems
- Dynamic Version of the Economic Lot Size Model
- Note—Performance Bounds for Lot Sizing Heuristics
- Efficient heuristics for dynamic lot sizing
- A Sequential Lot Sizing Heuristic with Optimal Average Performance
- Deterministic Production Planning: Algorithms and Complexity
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- A Deterministic Multi-Period Production Scheduling Model with Backlogging
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
This page was built for publication: Comparative study of dynamic lot sizing heuristics with backlogging