Optimal minimal-repair and replacement problem with age dependent cost structure
DOI10.1016/0898-1221(92)90233-8zbMATH Open0782.60059OpenAlexW2087202580MaRDI QIDQ1206111FDOQ1206111
Authors: Yoshiyuki Segawa, Masamitsu Ohnishi, Toshihide Ibaraki
Publication date: 1 April 1993
Published in: Computers & Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0898-1221(92)90233-8
Recommendations
- OPTIMAL MINIMAL-REPAIR AND REPLACEMENT PROBLEM UNDER AVERAGE COST CRITERION : OPTIMALITY OF (t, T)-POLICY
- Optimal replacement policies with minimal repair and age-dependent costs
- Extended optimal age replacement policy with minimal repair
- Extended optimal replacement model with random minimal repair costs
- Optimal preventive replacement under minimal repair and random repair cost
Reliability, availability, maintenance, inspection in operations research (90B25) Applications of renewal theory (reliability, demand theory, etc.) (60K10)
Cites Work
Cited In (5)
- The average optimality of a repair-limit replacement policy.
- Age-dependent minimal repair
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
- Optimal replacement policies with minimal repair and age-dependent costs
- Optimal preventive replacement under minimal repair and random repair cost
This page was built for publication: Optimal minimal-repair and replacement problem with age dependent cost structure
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1206111)