Deadline scheduling of tasks with ready times and resource constraints
From MaRDI portal
Publication:1255432
DOI10.1016/0020-0190(79)90143-1zbMATH Open0401.90048DBLPjournals/ipl/Blazewicz79OpenAlexW1985064863WikidataQ57387941 ScholiaQ57387941MaRDI QIDQ1255432FDOQ1255432
Publication date: 1979
Published in: Information Processing Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0020-0190(79)90143-1
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment
- On the computational power of pushdown automata
- Two-Processor Scheduling with Start-Times and Deadlines
- Title not available (Why is that?)
- Scheduling Tasks with Nonuniform Deadlines on Two Processors
- Scheduling Equal-Length Tasks Under Treelike Precedence Constraints to Minimize Maximum Lateness
- Title not available (Why is that?)
- Minimizing maximum lateness on one machine: computational experience and some applications
- Title not available (Why is that?)
- Simple algorithms for multiprocessor scheduling to meet deadlines
Cited In (11)
- Production, maintenance and resource scheduling: a review
- Scheduling jobs with release dates and tails on identical machines to minimize the makespan
- Scheduling tasks on two processors with deadlines and additional resources
- Restricted assignment scheduling with resource constraints
- Scheduling subject to resource constraints: Classification and complexity
- A linear time algorithm for restricted bin packing and scheduling problems
- Simulated annealing for resource-constrained scheduling
- Solving the resource constrained deadline scheduling problem via reduction to the network flow problem
- On a periodic maintenance problem
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
- Minimizing mean flow time with parallel processors and resource constraints
This page was built for publication: Deadline scheduling of tasks with ready times and resource constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1255432)