Setting planned lead times for multi-operation jobs
From MaRDI portal
(Redirected from Setting planned lead times for multi-operation jobs)
Recommendations
- Setting Planned Leadtimes in Capacity Requirements Planning
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Job shop leadtime requirements under conditions of controlled delivery performance
- Production planning with load dependent lead times
- Manufacturing lead times, system utilization rates and lead-time-related demand
Cites work
- A Simulation Study of Predictable Due-Dates
- A Tactical Planning Model for a Job Shop
- scientific article; zbMATH DE number 3174818 (Why is no real title available?)
- scientific article; zbMATH DE number 3522951 (Why is no real title available?)
- Lot Sizes, Lead Times and In-Process Inventories
- Setting Planned Leadtimes in Capacity Requirements Planning
Cited in
(12)- Lead time selection and the behaviour of work flow in job shops
- Job shop leadtime requirements under conditions of controlled delivery performance
- Setting optimal planned leadtimes in configure-to-order assembly systems
- Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
- Setting Planned Leadtimes in Capacity Requirements Planning
- Order-release planning using variable lead times based on a backward simulation model
- Lead time prediction in unbalanced production systems
- scientific article; zbMATH DE number 1786161 (Why is no real title available?)
- Time bucket length and lot-splitting approach
- Multiple sourcing: The determination of lead times
This page was built for publication: Setting planned lead times for multi-operation jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1266593)