Total completion time minimization in two-machine job shops with unit-time operations
From MaRDI portal
Publication:1278312
DOI10.1016/0377-2217(96)00132-4zbMath0953.90523OpenAlexW2089564682MaRDI QIDQ1278312
Wiesław X. Kubiak, Timkovsky, Vadim G.
Publication date: 22 February 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(96)00132-4
Related Items
Using mixed graph coloring to minimize total completion time in job shop scheduling, A polynomial-time algorithm for the two-machine unit-time release-date job-shop schedule-length problem, Is a unit-job shop not easier than identical parallel machines?, Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity, Minimizing the number of late jobs for the two-machine unit-time job-shop scheduling problem, Deterministic job-shop scheduling: Past, present and future, On scheduling cycle shops: Classification, complexity and approximation
Cites Work
- Unnamed Item
- Unnamed Item
- A pseudo-polynomial algorithm for a two-machine no-wait job-shop scheduling problem
- An efficient algorithm for a job shop problem
- An Efficient Optimal Algorithm for the Two-Machines Unit-Time Jobshop Schedule-Length Problem
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey