Economic scheduling of products with \(N\) components on a single machine
From MaRDI portal
Publication:1278534
DOI10.1016/0377-2217(95)00124-7zbMath0917.90191OpenAlexW2082364606MaRDI QIDQ1278534
Publication date: 5 August 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(95)00124-7
Related Items
Optimal single machine scheduling of products with components and changeover cost ⋮ Fabrication scheduling on a single machine with due date constraints
Cites Work
- Batching in single operation manufacturing systems
- One-pass batching algorithms for the one-machine problem
- Batching to Minimize Flow Times on One Machine
- Optimal Manufacturing of a Two Product Mix
- Optimal Scheduling of Products with Two Subassemblies on a Single Machine
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine