A branch and bound algorithm for the two-stage assembly scheduling problem
From MaRDI portal
(Redirected from Publication:1280185)
Recommendations
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- A hybrid tabu search heuristic for the two-stage assembly scheduling problem
- scientific article; zbMATH DE number 1979499
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
- A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem
- Branch, bound and remember algorithm for two-sided assembly line balancing problem
- A branch and bound algorithm for disassembly scheduling with assembly product structure
Cites work
- A Branch and Bound Algorithm for the Total Weighted Tardiness Problem
- An algorithm for single machine sequencing with deadlines to minimize total weighted completion time
- An algorithm for single machine sequencing with release dates to minimize total weighted completion time
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Optimal two- and three-stage production schedules with set-up time included
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
Cited in
(39)- Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
- Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms
- Minimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effect
- A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- Scheduling for two-stage production system with setup and assembly operations
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
- A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop
- Optimization study of three-stage assembly flowshop problem in pharmacy automation dispensing systems
- Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect
- Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing
- Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times
- Flow-shop scheduling with setup and assembly operations
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- BRANCHING TECHNIQUE FOR A BI-OBJECTIVE TWO-STAGE ASSIGNMENT PROBLEM
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- A biased‐randomized iterated local search for the distributed assembly permutation flow‐shop problem
- Collaborative optimization of workshop layout and scheduling
- Lot streaming for a two-stage assembly system in the presence of handling costs
- Three-stage assembly flow shop scheduling problem with a fixed maintenance period
- On the two-stage assembly flow shop problem
- Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
- Algorithms for two-machine flow-shop sequencing with precedence constraints
- Cyclic robot scheduling for 3D printer-based flexible assembly systems
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
- Minimizing customer order lead-time in a two-stage assembly supply chain
- The production scheduling problem in a multi-page invoice printing system
This page was built for publication: A branch and bound algorithm for the two-stage assembly scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1280185)