Optimal pacing in an assembly-based multi-stage production system
From MaRDI portal
Publication:1290179
DOI10.1023/A:1018913926245zbMATH Open0922.90080OpenAlexW196700562MaRDI QIDQ1290179FDOQ1290179
Publication date: 10 June 1999
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1018913926245
Recommendations
- Optimal workforce assignment to operations of a paced assembly line
- Optimal control of an assembly system with multiple stages and multiple demand classes
- Designing paced assembly lines with fixed number of stations
- An optimal policy for controlling the flow time in an assembly line system
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- scientific article; zbMATH DE number 4079154
- Multi-objective lead time control in multistage assembly systems
- Optimal Control of a High-Volume Assemble-to-Order System
- Optimization of industrial-scale assemble-to-order systems
Cited In (3)
This page was built for publication: Optimal pacing in an assembly-based multi-stage production system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1290179)