HOP: A software tool for production scheduling at Bridgestone/Firestone Off-The-Road
From MaRDI portal
Publication:1303560
DOI10.1016/S0377-2217(98)00092-7zbMath0948.90090MaRDI QIDQ1303560
Publication date: 16 September 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90) Decomposition methods (49M27)
Uses Software
Cites Work
- Branch-and-Price: Column Generation for Solving Huge Integer Programs
- Decomposition Principle for Linear Programs
- A Linear Programming Approach to the Cutting-Stock Problem
- Maximizing Submodular Set Functions: Formulations and Analysis of Algorithms
- A Tire Production Scheduling System for Bridgestone/Firestone Off-The-Road
This page was built for publication: HOP: A software tool for production scheduling at Bridgestone/Firestone Off-The-Road