Minimizing the number of late jobs under the group technology assumption
From MaRDI portal
(Redirected from Publication:1304380)
Recommendations
- The complexity of two group scheduling problems
- Two scheduling problems in group technology with deteriorating jobs
- Group sequencing around a common due date
- scientific article; zbMATH DE number 2219118
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
Cited in
(7)- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
- The complexity of two group scheduling problems
- A survey of scheduling problems with setup times or costs
- A note on the complexity of family scheduling to minimize the number of late jobs
- A hybrid heuristic approach to minimize number of tardy jobs in group technology systems
- Single machine group scheduling with resource dependent setup and processing times
- Group sequencing around a common due date
This page was built for publication: Minimizing the number of late jobs under the group technology assumption
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1304380)