Minimizing variation in stochastic flow shop
From MaRDI portal
Publication:1306384
DOI10.1016/S0167-6377(98)00039-XzbMATH Open0957.90067OpenAlexW2013506466WikidataQ127202864 ScholiaQ127202864MaRDI QIDQ1306384FDOQ1306384
Authors: Chunfu Jia
Publication date: 1998
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(98)00039-x
Recommendations
Cites Work
Cited In (6)
- On Minimizing the Expected Makespan and Flow Time in Stochastic Flow Shops with Blocking
- Inequalities for stochastic flow shops and job shops
- A mean-variance model for the minimum cost flow problem with stochastic arc costs
- Mean‐standard deviation model for minimum cost flow problem
- Two-machine stochastic flow shops with blocking and the traveling salesman problem
- A contribution to the stochastic flow shop scheduling problem.
This page was built for publication: Minimizing variation in stochastic flow shop
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1306384)