Inspection interval for maximum future reliability using the delay time model
From MaRDI portal
Publication:1308884
DOI10.1016/0377-2217(93)90306-8zbMath0805.90048OpenAlexW1990885026MaRDI QIDQ1308884
Publication date: 10 December 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://vuir.vu.edu.au/25686/2/TECHNICALREPORT4_compressed.pdf
Related Items (3)
Sequential inspection strategy for multiple systems under availability requirement. ⋮ Optimal policies for a delay time model with postponed replacement ⋮ Towards Practical and Synthetical Modelling of Repairable Systems
Cites Work
This page was built for publication: Inspection interval for maximum future reliability using the delay time model