Cellular control of manufacturing systems
From MaRDI portal
Publication:1309976
DOI10.1016/0377-2217(93)90031-HzbMATH Open0784.90034MaRDI QIDQ1309976FDOQ1309976
Authors: M. Cavalotto, F. Della Croce, Giuseppe Menga, Roberto Tadei, Larissa A. Petri
Publication date: 6 January 1994
Published in: European Journal of Operational Research (Search for Journal in Brave)
Recommendations
- scientific article; zbMATH DE number 1786162
- Cell control research— current status and development trends
- Optimal Flow Control for Continuous‐time Scheduling in Flexible Manufacturing Systems
- On-line scheduling in a multi-cell flexible manufacturing system
- Optimal flow control in manufacturing systems. Production planning and scheduling. Incl. 1 disk
Cites Work
- A Computational Study of the Job-Shop Scheduling Problem
- Title not available (Why is that?)
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- Title not available (Why is that?)
- Title not available (Why is that?)
- Approximation algorithms for scheduling unrelated parallel machines
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- Title not available (Why is that?)
- An Algorithm for Solving the Job-Shop Problem
- Optimal Solution of Scheduling Problems Using Lagrange Multipliers: Part I
- An algorithm for single machine sequencing with release dates to minimize total weighted completion time
- A Branch and Bound Algorithm for the Total Weighted Tardiness Problem
- A Lagrangean Based Branch and Bound Algorithm for Single Machine Sequencing with Precedence Constraints to Minimize Total Weighted Completion Time
- A Survey of Lagrangean Techniques for Discrete Optimization
- A survey of various tactics for generating Lagrangian multipliers in the context of Lagrangian duality
- Title not available (Why is that?)
- Algorithms for two-machine flow-shop sequencing with precedence constraints
- A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems
- Ordering scheduling problem in manufacturing systems
- Solving the resource constrained deadline scheduling problem via reduction to the network flow problem
- Title not available (Why is that?)
Cited In (6)
- An intelligent controller for manufacturing cells
- Aggregate planning and scheduling in the food industry: A case study
- An optimisation-oriented model of distributed supply-chain
- Manufacturing capability measurement for cellular manufacturing systems
- Management of product variety in cellular manufacturing systems
- Identifying the composition of a cellular manufacturing system
Uses Software
This page was built for publication: Cellular control of manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1309976)