Determining the optimal starting times in a cyclic schedule with a given route
From MaRDI portal
(Redirected from Publication:1310046)
Recommendations
- Minimizing the fleet size with dependent time-window and single-track constraints
- A bounding scheme for deriving the minimal cycle time of a single- transporter \(N\)-stage process with time-window constraints
- A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times
- Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints
- Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
Cites work
- scientific article; zbMATH DE number 3985132 (Why is no real title available?)
- A Mathematical Model for Periodic Scheduling Problems
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- Fixed Cycle Scheduling: A Solvable Problem with Empty Precedence Structure
- Lagrangian Relaxation Methods for Solving the Minimum Fleet Size Multiple Traveling Salesman Problem with Time Windows
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints
Cited in
(14)- A graph-based analysis of the cyclic scheduling problem with time constraints: schedulability and periodicity of the earliest schedule
- A parametric critical path problem and an application for cyclic scheduling
- On-line scheduling in a surface treatment system
- A solution for cyclic scheduling of multi-hoists without overlapping
- Overlapping Start-Time Bands in Implicit Tour Scheduling
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Time-optimal scheduling for high throughput screening processes using cyclic discrete event models
- A bounding scheme for deriving the minimal cycle time of a single- transporter \(N\)-stage process with time-window constraints
- Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
- Cyclic scheduling in a robotic production line
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
- Bounds and tabu search for a cyclic max-min scheduling problem
- A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times
- Minimizing the fleet size with dependent time-window and single-track constraints
This page was built for publication: Determining the optimal starting times in a cyclic schedule with a given route
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1310046)