CMIT, capacitated multi-level implosion tool
From MaRDI portal
Publication:1333500
DOI10.1016/0377-2217(94)90284-4zbMath0810.90054OpenAlexW1976098512MaRDI QIDQ1333500
Laureano Fernando Escudero Bueno
Publication date: 15 September 1994
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90284-4
large-scale real-life problemsmulti-product, multi-level, multi-period manufacturing networkresource deployment
Related Items
Capacity and material requirement planning modelling by comparing deterministic and fuzzy models, Some of my favorite integer programming applications at IBM, On the time-consistent stochastic dominance risk averse measure for tactical supply chain planning under uncertainty, Schumann, a modeling framework for supply chain management under uncertainty, CMIT, Multi-process production scheduling with variable renewable integration and demand response
Cites Work
- Multi-stage production-inventory systems
- A production planning problem in FMS
- Resource allocation among competing activities: A lexicographic minimax approach
- Machine allocation problems in manufacturing networks
- A min-max resource allocation problem with substitutions
- Production planning via scenario modelling
- An integrated plant loading model with economies of scale and scope
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes
- Minimax Resource Allocation with Tree Structured Substitutable Resources
- Uncapacitated Lot-Sizing Problems with Start-Up Costs
- A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs
- A Tactical Planning Model for a Job Shop
- Lot Sizes, Lead Times and In-Process Inventories
- A Max-Min Allocation Problem: Its Solutions and Applications
- A duality model for a generalized minmax program
- Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
- A Dynamic Lot Sizing Model with Learning in Setups
- Dynamic Lot Size Models for Multi-Stage Assembly Systems
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- An Efficient Algorithm for Multi-Item Scheduling