Optimal resource leveling using non-serial dynamic programming
From MaRDI portal
Publication:1341995
DOI10.1016/0377-2217(94)90380-8zbMATH Open0812.90062OpenAlexW2052850947MaRDI QIDQ1341995FDOQ1341995
Authors: V. Pereyra
Publication date: 25 January 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90380-8
Recommendations
- Exact methods for the resource levelling problem
- Resource levelling for projects with schedule-dependent time windows
- Mixed-integer linear programming for resource leveling problems
- Resource allocation via dynamic programming in activity networks
- Minimizing Resource Availability Costs in Time-Limited Project Networks
Cites Work
Cited In (18)
- A cost optimization model for multiresource leveling problem without project duration constraint
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A genetic algorithm for the robust resource leveling problem
- The total adjustment cost problem: applications, models, and solution algorithms
- Optimal project duration for resource leveling
- The crew timetabling problem: an extension of the crew scheduling problem
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Resource levelling for projects with schedule-dependent time windows
- Mixed-integer linear programming for resource leveling problems
- Exact methods for the resource levelling problem
- A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
- Order-based neighborhoods for project scheduling with nonregular objective functions.
- A metaheuristic solution approach for the time-constrained project scheduling problem
- SCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDY
- Resource leveling in projects with flexible structures
- Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space
- Scheduling contractors' farm‐to‐farm crop harvesting operations
This page was built for publication: Optimal resource leveling using non-serial dynamic programming
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1341995)