Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint

From MaRDI portal
Publication:1362517

DOI10.1016/S0167-6377(96)00041-7zbMATH Open0882.90069OpenAlexW2071126781MaRDI QIDQ1362517FDOQ1362517


Authors: Chung-Yee Lee Edit this on Wikidata


Publication date: 5 August 1997

Published in: Operations Research Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0167-6377(96)00041-7




Recommendations




Cites Work


Cited In (61)





This page was built for publication: Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1362517)