Minimizing the total completion time in a unit-time open shop with release times
From MaRDI portal
Publication:1362528
DOI10.1016/S0167-6377(97)00015-1zbMATH Open0885.90062OpenAlexW2076906849WikidataQ127633500 ScholiaQ127633500MaRDI QIDQ1362528FDOQ1362528
Authors: Thomas Tautenhahn, Gerhard J. Woeginger
Publication date: 5 August 1997
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(97)00015-1
Recommendations
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Title not available (Why is that?)
- On Edge Coloring Bipartite Graphs
- Scheduling Open Shops with Unit Execution Times to Minimize Functions of Due Dates
- A preemptive open shop scheduling problem with one resource
- Open shop problems with unit time operations
- Scheduling unit time open shops to minimize the weighted number of late jobs
- Scheduling Unit-Time Open Shops with Deadlines
- Note: Open-shop scheduling with release dates to minimize maximum lateness
- Title not available (Why is that?)
Cited In (10)
- A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems
- Open shop problem with zero-one time operations and integer release date/deadline intervals
- Minimizing total completion time for UET tasks with release time and outtree precedence constraints
- A linear time approximation scheme for makespan minimization in an open shop with release dates
- Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem
- The complexity of mean flow time scheduling problems with release times
- Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
- On minimizing the weighted number of late jobs in unit execution time open-shops.
- Polynomial time algorithms for special open shop problems with precedence constraints and unit processing times
- Unit-time scheduling problems with time dependent resources
This page was built for publication: Minimizing the total completion time in a unit-time open shop with release times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1362528)