Optimal feedback controls in deterministic dynamic two-machine flowshops
From MaRDI portal
Publication:1362987
Recommendations
- Optimal feedback controls in deterministic two-machine flowshops with finite buffers
- scientific article; zbMATH DE number 912603
- Optimal feedback production planning in a stochastic two-machine flowshop
- Existence of optimal feedback production plans in stochastic flowshops with limited buffers
- scientific article; zbMATH DE number 1060039
Cites work
- scientific article; zbMATH DE number 1350741 (Why is no real title available?)
- scientific article; zbMATH DE number 912603 (Why is no real title available?)
- Computational Evaluation of Hierarchical Production Control Policies for Stochastic Manufacturing Systems
- Optimal control of production rate in a failure prone manufacturing system
- Optimal feedback production planning in a stochastic two-machine flowshop
- Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Turnpike Horizons for Production Planning
Cited in
(7)- Optimal production rates in a deterministic two-product manufacturing system
- Dynamic modeling and control of supply chain systems: A review
- Optimal feedback production planning in a stochastic two-machine flowshop
- Optimal production planning in pull flow lines with multiple products
- Optimal feedback controls in deterministic two-machine flowshops with finite buffers
- Hierarchical production policies in stochastic two-machine flowshops with finite buffers
- Computation of optimal production plans for manufacturing systems
This page was built for publication: Optimal feedback controls in deterministic dynamic two-machine flowshops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1362987)