Preassignment requirements in chromatic scheduling
From MaRDI portal
Publication:1363744
DOI10.1016/S0166-218X(97)82776-XzbMATH Open0882.90076OpenAlexW2022686688MaRDI QIDQ1363744FDOQ1363744
N. V. R. Mahadev, Dominique De Werra
Publication date: 24 February 1998
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: http://www.elsevier.com/locate/dam
Recommendations
Deterministic scheduling theory in operations research (90B35) Coloring of graphs and hypergraphs (05C15)
Cites Work
- The NP-Completeness of Edge-Coloring
- Title not available (Why is that?)
- On the Complexity of Timetable and Multicommodity Flow Problems
- An introduction to timetabling
- Precoloring extension. I: Interval graphs
- Title not available (Why is that?)
- Title not available (Why is that?)
- Some results concerning the complexity of restricted colorings of graphs
- Chromatic scheduling and frequency assignment
- Open shop scheduling with some additional constraints
- Interval vertex-coloring of a graph with forbidden colors
- Restrictions and preassignments in preemptive open shop scheduling
- Interval edge coloring of a graph with forbidden colors
- Edge-Chromatic Scheduling with Simultaneity Constraints
Cited In (2)
This page was built for publication: Preassignment requirements in chromatic scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1363744)