Optimal lot sizing with regular maintenance interruptions
From MaRDI portal
Publication:1364634
DOI10.1016/S0307-904X(96)00149-7zbMath0879.90110OpenAlexW2012214451MaRDI QIDQ1364634
Mohamad Y. Jaber, Moueen K. Salameh
Publication date: 27 August 1997
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0307-904x(96)00149-7
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Related Items (4)
Considering human error in optimizing production and corrective and preventive maintenance policies for manufacturing systems ⋮ Determining an optimal production run length with an extended quality control policy for an imperfect process ⋮ Economic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristic ⋮ Group maintenance scheduling for two-component systems with failure interaction
Cites Work
- Lot sizes and setup frequency with learning in setups and process quality
- Maintenance optimization of a production system with buffer capacity
- Production breaks and the learning curve: The forgetting phenomenon
- A Preventive Replacement Policy for Units Subject to Intermittent Demand
- Investing in Reduced Setups in the EOQ Model
- Lot Sizes, Lead Times and In-Process Inventories
- Production lot sizing under setup and worker learning
- Production Lot Sizing with Machine Breakdowns
- Production Batching with Machine Breakdowns and Safety Stocks
- A Condition Based Maintenance Model with Exponential Failures and Fixed Inspection Intervals
This page was built for publication: Optimal lot sizing with regular maintenance interruptions