A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
From MaRDI portal
(Redirected from Publication:1373161)
Recommendations
- Capital- and resource-constrained project scheduling with net present value optimization
- scientific article; zbMATH DE number 6129891
- Heuristic scheduling of resource-constrained projects with cash flows
- Performance of the heuristic procedures for constrained projects with progress payments
- On maximizing the net present value of a project under renewable resource constraints
Cites work
- scientific article; zbMATH DE number 3688701 (Why is no real title available?)
- scientific article; zbMATH DE number 3532286 (Why is no real title available?)
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A constraint-based perspective in resource constrained project scheduling
- A framework for an interactive project scheduling system under limited resources
- A local constraint based analysis approach to project scheduling under general resource constraints
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- Cash Flows in Networks
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
- Hierarchical models for multi-project planning and scheduling
- Integration of technical, cost, and schedule risks in project management
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- Scheduling a project to maximize its net present value: An integer programming approach
- The scheduling of activities to maximize the net present value of projects
Cited in
(14)- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty
- Optimization of a highway project planning using a modified genetic algorithm
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
- Maximizing the net present value of a project under uncertainty
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap
- Capital- and resource-constrained project scheduling with net present value optimization
- scientific article; zbMATH DE number 6129891 (Why is no real title available?)
- Scheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approach
- Metaheuristics for multi-mode capital-constrained project payment scheduling
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
This page was built for publication: A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows