Two-stage flowshop scheduling with a common second-stage machine
From MaRDI portal
Publication:1373162
DOI10.1016/S0305-0548(97)00023-3zbMATH Open0883.90067OpenAlexW1991511510MaRDI QIDQ1373162FDOQ1373162
Authors: B. M. T. Lin, Ceyda Oğuz, T. C. Edwin Cheng
Publication date: 23 March 1998
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(97)00023-3
Recommendations
- Two-Stage, Hybrid Flowshop Scheduling Problem
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- A flowshop scheduling problem with two operations per job
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
Cites Work
- Title not available (Why is that?)
- Optimal two- and three-stage production schedules with set-up time included
- The Complexity of Flowshop and Jobshop Scheduling
- Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- A General Bounding Scheme for the Permutation Flow-Shop Problem
- A Comparative Study of Flow-Shop Algorithms
- Sequencing \(n\) jobs on two machines with arbitrary time lags
- Optimal Two-Machine Orderings in the 3 × n Flow-Shop Problem
Cited In (21)
- A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
- On the two-stage hybrid flow shop with dedicated machines
- A two-stage flow shop scheduling problem with transportation considerations
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
- A two-stage hybrid flow shop with dedicated machines at the first stage
- Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage
- Batch scheduling in a two-stage flexible flow shop problem
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
- The optimal number of used machines in a two-stage flexible flowshop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine
- Title not available (Why is that?)
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- A note on the two-stage hybrid flow shop problem with dedicated machines
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
- Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint
- Scheduling flexible flow lines with sequence-dependent setup times
This page was built for publication: Two-stage flowshop scheduling with a common second-stage machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1373162)