Applying constraint satisfaction techniques to job shop scheduling
From MaRDI portal
Publication:1374445
DOI10.1023/A:1018934507395zbMATH Open0890.90093MaRDI QIDQ1374445FDOQ1374445
Stephen F. Smith, Cheng-Chung Cheng
Publication date: 4 December 1997
Published in: Annals of Operations Research (Search for Journal in Brave)
constraint satisfaction problemdeadline schedulingmakespan minimizationmulti-product hoist scheduling
Cited In (18)
- Title not available (Why is that?)
- Constraint propagation and problem decomposition: A preprocessing procedure for the job shop problem
- Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
- On singleton arc consistency for CSPs defined by monotone patterns
- Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search
- Title not available (Why is that?)
- Temporal constraint satisfaction techniques in job shop scheduling problem solving
- Continuous management of airlift and tanker resources: a constraint-based approach
- An integrated search heuristic for large-scale flexible job shop scheduling problems
- Constraint-directed techniques for scheduling alternative activities
- Title not available (Why is that?)
- On Singleton Arc Consistency for CSPs Defined by Monotone Patterns
- Title not available (Why is that?)
- Efficient solution techniques for disjunctive temporal reasoning problems
- Title not available (Why is that?)
- Deterministic job-shop scheduling: Past, present and future
- Constraint satisfaction problems: Algorithms and applications
Uses Software
Recommendations
- Title not available (Why is that?) π π
- Constraint Propagation Based Scheduling of Job Shops π π
- Temporal constraint satisfaction techniques in job shop scheduling problem solving π π
- A computational study of constraint satisfaction for multiple capacitated job shop scheduling π π
- Constraint-based job shop scheduling with Ilog Scheduler π π
This page was built for publication: Applying constraint satisfaction techniques to job shop scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1374445)