An analysis of heuristics for the parallel-machine flexible-resource scheduling problem
From MaRDI portal
(Redirected from Publication:1374455)
Recommendations
- A tabu-search heuristic for the flexible-resource flow shop scheduling problem
- Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment
- Scheduling with flexible resources in parallel workcenters to minimize maximum completion time
- Tabu search for discrete-continuous scheduling problems with heuristic continuous resource allocation
Cited in
(14)- Worst-case analysis of scheduling heuristics of parallel systems
- Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment
- Production, maintenance and resource scheduling: a review
- A new approximation algorithm for unrelated parallel machine scheduling with release dates
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
- A tabu-search heuristic for the flexible-resource flow shop scheduling problem
- Static and dynamic resource allocation models for recovery of interdependent systems: application to the Deepwater Horizon oil spill
- A Heuristic of Scheduling Parallel Tasks and Its Analysis
- Cyclic job scheduling in paced assembly lines with cross-trained workers
- Scheduling of unrelated parallel manufacturing cells with limited human resources
- Exact algorithms for a parallel machine scheduling problem with workforce and contiguity constraints
- A tabu search algorithm for unspecified parallel machine scheduling with shift consideration
- Optimal energy scheduling under time-of-use tariffs
- Scheduling with flexible resources in parallel workcenters to minimize maximum completion time
This page was built for publication: An analysis of heuristics for the parallel-machine flexible-resource scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1374455)