An optimal production flow control problem with impulsive demand
From MaRDI portal
Publication:1381747
DOI10.1016/S0895-7177(97)00122-2zbMath0896.90134OpenAlexW1987453276MaRDI QIDQ1381747
Publication date: 1 April 1998
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0895-7177(97)00122-2
productionswitchingproduction controlimpulsive demandPontryagin's extremum principlereliable single machine
Differential games and control (49N70) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Pursuit and evasion games (49N75)
Cites Work
- Unnamed Item
- Dynamic setup scheduling and flow control in manufacturing systems
- An optimal production flow control problem with piecewise constant demand
- Optimal control of production rate in a failure prone manufacturing system
- Optimal control of a production system with periodic maintenance
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Turnpike sets in stochastic manufacturing systems with finite time horizon
- Manufacturing flow control and preventing maintenance: a stochastic control approach
This page was built for publication: An optimal production flow control problem with impulsive demand