\(V\)- and \(\Lambda\)-shaped properties for optimal single machine schedules for a class of non-separable penalty functions
From MaRDI portal
Publication:1390208
DOI10.1016/0377-2217(94)00102-IzbMath0906.90091OpenAlexW1997459831MaRDI QIDQ1390208
John Mittenthal, Arif I. Rana, M. Raghavachari
Publication date: 14 July 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00102-i
single machinemultiple criteriasquare of the meansum of the squaresthree functions of job completion times
Related Items (2)
Job scheduling methods for reducing waiting time variance ⋮ A lower bound for weighted completion time variance
Cites Work
- A V-shape property of optimal schedule of jobs about a common due date
- Single machine scheduling with coefficient of variation minimization
- V-shape property for optimal schedules with monotone penalty functions
- A hybrid simulated annealing approach for single machine scheduling problems with non-regular penalty functions
- Completion time variance minimization on a single machine is difficult
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- On the Minimization of Completion Time Variance with a Bicriteria Extension
- Flowshop sequencing problem with ordered processing time matrices: A general case
- Minimising Waiting Time Variance in the Single Machine Problem
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
This page was built for publication: \(V\)- and \(\Lambda\)-shaped properties for optimal single machine schedules for a class of non-separable penalty functions