Single machine, scheduling problem with fuzzy precedence relation
From MaRDI portal
Publication:1390285
DOI10.1016/0377-2217(94)00162-6zbMath0914.90163OpenAlexW2013034096MaRDI QIDQ1390285
Publication date: 23 June 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00162-6
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (12)
Scheduling with fuzzy delays and fuzzy precedences. ⋮ The EDD rule for fuzzy job time ⋮ A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions ⋮ Optimal fuzzy counterparts of scheduling rules ⋮ Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine ⋮ A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project ⋮ Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. ⋮ Multi-objective genetic algorithm for single machine scheduling problem under fuzziness ⋮ Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms ⋮ Fuzzy job shop scheduling with lot-sizing ⋮ Survey on fuzzy shop scheduling ⋮ On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
Cites Work
This page was built for publication: Single machine, scheduling problem with fuzzy precedence relation