Offsetting inventory cycles of items sharing storage.
From MaRDI portal
Publication:1405232
DOI10.1016/S0377-2217(02)00518-0zbMATH Open1137.90320OpenAlexW2164432918MaRDI QIDQ1405232FDOQ1405232
Authors: Nagesh N. Murthy, W. C. Benton, Paul A. Rubin
Publication date: 25 August 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(02)00518-0
Recommendations
- Offsetting inventory replenishment cycles to minimize storage space
- Threshold results for the inventory cycle offsetting problem
- Offsetting inventory replenishment cycles
- Bi-level programming for optimal inventory control with offsetting replenishment cycles
- A fast heuristic for minimising total average cycle stock subject to practical constraints
Cites Work
- A Simple Method of Determining Order Quantities in Joint Replenishments Under Deterministic Demand
- Title not available (Why is that?)
- 98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems
- On the Single Resource Capacity Problem for Multi-Item Inventory Systems
- A multi-item EOQ model with inventory cycle balancing
- Title not available (Why is that?)
- Multi-Product Inventory Situations with One Restriction
- Deterministic Multi-Item Inventory Systems with Limited Capacity
- Quantity discount decisions under conditions of multiple items, multiple suppliers and resource limitations
- Technical Note—Optimal Scheduling of Periodic Activities
- Determination of Economic Packaging Frequency for Items Jointly Replenished
- Optimum Ordering Policy for a Multi Item Single Supplier System
- An Algorithm for Limited Capacity Inventory Problem with Staggering
- A Note on "Multi-Product Inventory Situations with One Restriction"
Cited In (8)
- Determination of replenishment dates for restricted-storage, static demand, cyclic replenishment schedule
- Title not available (Why is that?)
- Bi-level programming for optimal inventory control with offsetting replenishment cycles
- The inventory replenishment planning and staggering problem: a bi-objective approach
- Offsetting inventory replenishment cycles
- A fully polynomial time approximation scheme for the replenishment storage problem
- Offsetting inventory replenishment cycles to minimize storage space
- The Replenishment Schedule to Minimize Peak Storage Problem: The Gap Between the Continuous and Discrete Versions of the Problem
This page was built for publication: Offsetting inventory cycles of items sharing storage.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1405232)