Fuzzy random bottleneck spanning tree problems using possibility and necessity measures

From MaRDI portal
Publication:1410325

DOI10.1016/S0377-2217(02)00523-4zbMath1030.90145MaRDI QIDQ1410325

Masatoshi Sakawa, Hiroaki Ishii, Hideki Katagiri

Publication date: 14 October 2003

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (14)

Stackelberg solutions for fuzzy random bilevel linear programming through level sets and probability maximizationInteractive fuzzy random two-level linear programming through fractile criterion optimizationStackelberg solutions for fuzzy random two-level linear programming through probability maximization with possibilityStackelberg solutions for fuzzy random two-level linear programming through level sets and fractile criterion optimizationA general concept for solving linear multicriteria programming problems with crisp, fuzzy or stochastic valuesQuadratic bottleneck problemsINTERACTIVE DECISION MAKING USING POSSIBILITY AND NECESSITY MEASURES FOR A FUZZY RANDOM MULTIOBJECTIVE 0–1 PROGRAMMING PROBLEMInteractive multiobjective fuzzy random linear programming: Maximization of possibility and probabilityRisk-control approach for a bottleneck spanning tree problem with the total network reliability under uncertaintyA fuzzy random multiobjective 0--1 programming based on the expectation optimization model using possibility and necessity measuresInteractive multiobjective fuzzy random programming through the level set-based probability modelChance-constrained programming with fuzzy stochastic coefficientsSistema imunológico artificial para resolver o problema da árvore geradora mínima com parâmetros fuzzyPossibility/necessity-based probabilistic expectation models for linear programming problems with discrete fuzzy random variables



Cites Work


This page was built for publication: Fuzzy random bottleneck spanning tree problems using possibility and necessity measures