An efficient tabu search approach for the two-machine preemptive open shop scheduling problem.
From MaRDI portal
Publication:1422367
Recommendations
- Scheduling preemptive open shops to minimize total tardiness
- Scheduling two-machine preemptive open shops to minimize total completion time
- A tabu search algorithm for the open shop problem
- A tabu search algorithm for the open shop scheduling problem
- A tabu search approach for proportionate multiprocessor open shop scheduling
Cites work
- scientific article; zbMATH DE number 5345853 (Why is no real title available?)
- scientific article; zbMATH DE number 1016767 (Why is no real title available?)
- scientific article; zbMATH DE number 1062113 (Why is no real title available?)
- scientific article; zbMATH DE number 1488569 (Why is no real title available?)
- scientific article; zbMATH DE number 830382 (Why is no real title available?)
- A General Bounding Scheme for the Permutation Flow-Shop Problem
- A Note on Open Shop Preemptive Schedules
- A branch \(\&\) bound algorithm for the open-shop problem
- A dual algorithm for the one-machine scheduling problem
- A hybrid genetic algorithm for the open shop scheduling problem
- Applying tabu search to the job-shop scheduling problem
- Classical and new heuristics for the open-shop problem: A computational evaluation
- Constructive heuristic algorithms for the open shop problem
- Future paths for integer programming and links to artificial intelligence
- Massively parallel tabu search for the quadratic assignment problem
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- Minimizing Total Tardiness on One Machine is NP-Hard
- On the complexity of preemptive open-shop scheduling problems
- On the complexity of preemptive openshop scheduling problems
- Open Shop Scheduling to Minimize Finish Time
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops
- Scheduling ordered open shops
- Scheduling the Open Shop to Minimize Mean Flow Time
- Tabu Search—Part I
- Tabu Search—Part II
Cited in
(4)
This page was built for publication: An efficient tabu search approach for the two-machine preemptive open shop scheduling problem.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1422367)