An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem.
From MaRDI portal
Publication:1429932
DOI10.1016/S0377-2217(03)00024-9zbMath1056.90004OpenAlexW1993854062MaRDI QIDQ1429932
Mikkel T. Jensen, Moutaz J. Khouja
Publication date: 27 May 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(03)00024-9
Related Items (5)
An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy ⋮ A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case ⋮ A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains ⋮ Replenishment policy based on modified ant colony optimisation and statistical analysis under the pre-order penetration point ⋮ Economical production and transshipment policy for coordinating multiple production sites
Cites Work
This page was built for publication: An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem.