Note on cyclic sequences in the product rate variation problem
From MaRDI portal
Publication:1577992
Recommendations
- Optimality of the cyclic sequence on bottleneck product rate variation problem with a general objective
- scientific article; zbMATH DE number 3252389
- The Deterministic Dynamic Product Cycling Problem
- On stationary and cycle-stationary sequences
- On dispersability of some products of cycles
- On cycle sequences
- On the identification problems in products of cycles
- The stochastic dynamic product cycling problem
- Note on rapidly varying sequences
Cites work
- A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- A comment on ``A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Heuristics and exact algorithms for solving the Monden problem
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Minimizing variation of production rates in just-in-time systems: A survey
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
Cited in
(4)
This page was built for publication: Note on cyclic sequences in the product rate variation problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1577992)