Nonlinear programming and genetic search application for production scheduling in coal mines
From MaRDI portal
Publication:1593505
DOI10.1023/A:1018958209290zbMath0997.90540MaRDI QIDQ1593505
James A. Rodger, Parag C. Pendharkar
Publication date: 17 January 2001
Published in: Annals of Operations Research (Search for Journal in Brave)
90C30: Nonlinear programming
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
90B30: Production models
90B90: Case-oriented studies in operations research
Related Items
An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem, An empirical study of impact of crossover operators on the performance of non-binary genetic algorithm based neural approaches for classification., A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain, GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times, A threshold-varying artificial neural network approach for classification and its application to bankruptcy prediction problem