A graphical method to repair-cost limit replacement policies with imperfect repair.
From MaRDI portal
Publication:1597072
DOI10.1016/S0895-7177(00)00076-5zbMath1042.90540OpenAlexW2017279834WikidataQ127452288 ScholiaQ127452288MaRDI QIDQ1597072
Naoto Kaio, Tadashi Dohi, Shunji Osaki
Publication date: 5 May 2002
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0895-7177(00)00076-5
Reliability, availability, maintenance, inspection in operations research (90B25) Graphical methods in numerical analysis (65S05)
Related Items (7)
Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy ⋮ The optimal repair-time limit replacement policy with imperfect repair: Lorenz transform approach ⋮ A new graphical method to estimate the optimal repair-time limit with incomplete repair and discounting ⋮ Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy ⋮ Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time ⋮ DISCRETE REPAIR-COST LIMIT REPLACEMENT POLICIES WITH/WITHOUT IMPERFECT REPAIR ⋮ Avaliação bayesiana da eficácia da manutenção via processo de renovação generalizado
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Nonparametric repair-limit replacement policies with imperfect repair
- The Total Time on Test Concept and Its Use in Reliability Theory
- A Note on the Repair Limit Replacement Policy
- Optimal Repair Limit Replacement Policies with Imperfect Repair
- Optimum ordering policies with lead time for an operating unit
- Optimum repair limit policies with a time constraint
- The Optimum Repair Limit Replacement Policies
- GRAPHICAL/STATISTICAL APPROACH TO REPAIR LIMIT REPLACEMENT PROBLEM
This page was built for publication: A graphical method to repair-cost limit replacement policies with imperfect repair.