MRP performance effects due to forecast bias and demand uncertainty
From MaRDI portal
Publication:1600889
DOI10.1016/S0377-2217(01)00134-5zbMath1007.90034OpenAlexW2092309000MaRDI QIDQ1600889
Publication date: 16 June 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00134-5
manufacturingproduction planningforecastingmaster production schedulingmaterial requirements planning
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items
Analytical debiasing of corporate cash flow forecasts, Setting planned orders in master production scheduling under demand uncertainty, Time bucket length and lot-splitting approach
Cites Work
- Due date assignment procedures with dynamically updated coefficients for multilevel assembly job shops
- Safety Stock and Service Levels in Periodic Review Inventory Systems
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- Parameters affecting the effectiveness of MRP systems: A review