The hot strip mill production scheduling problem: A tabu search approach
DOI10.1016/S0377-2217(97)00277-4zbMATH Open0991.90060OpenAlexW2060124106MaRDI QIDQ1609896FDOQ1609896
Authors: Leo Lopez, Michael W. Carter, Michel Gendreau
Publication date: 18 August 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(97)00277-4
Recommendations
Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Search theory (90B40)
Cites Work
- A user's guide to tabu search
- Future paths for integer programming and links to artificial intelligence
- The prize collecting traveling salesman problem
- Tabu Search—Part I
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Tabu search for large scale timetabling problems
- Tabu Search—Part II
- Some no-wait shops scheduling problems: Complexity aspect
- A multi-stage parallel-processor flowshop problem with minimum flowtime
- Performance of scheduling algorithms for no-wait flowshops with parallel machines
- A new heuristic method for the flow shop sequencing problem
- An Evolutionary Tabu Search Algorithm And The NHL Scheduling Problem
- A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows
- Restricted neighborhood in the tabu search for the flowshop problem
- Effective job shop scheduling through active chain manipulation
- The three-machine flow-shop problem with arbitrary precedence relations
Cited In (30)
- A tabu search heuristic for scheduling the production processes at an oil refinery
- A multi-objective hot-rolling scheduling problem in the compact strip production
- Production scheduling optimization algorithm for the hot rolling processes
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
- Prize collecting traveling saleman problem based model and algorithm for hot strip rolling unit planning
- An efficient optimal solution to the coil sequencing problem in electro-galvanizing line
- A review of planning and scheduling systems and methods for integrated steel production
- Exact mathematical formulations and metaheuristic algorithms for production cost minimization: a case study of the cable industry
- Modeling and application for rolling scheduling problem based on TSP
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
- On the integrated charge planning with flexible jobs in primary steelmaking processes
- Solving the torpedo scheduling problem
- A concise guide to existing and emerging vehicle routing problem variants
- A nested column generation algorithm to the meta slab allocation problem in the steel making industry
- Modeling and solving the steelmaking and casting scheduling problem
- Integrated charge batching and casting width selection at Baosteel
- The undirected capacitated general routing problem with profits
- Penalty-based sequencing strategy implemented within a knowledge-based system
- Lot sizing and furnace scheduling in small foundries
- Scheduling steel plates on a roller furnace
- Simultaneously scheduling multiple turns for steel color-coating production
- Formulations and a Lagrangian relaxation approach for the prize collecting traveling salesman problem
- The vehicle routing problem with service level constraints
- Scheduling continuous aluminium casting lines
- Integration of continuous caster and hot strip mill planning for steel production
- Grouping products for the optimization of production processes: a case in the steel manufacturing industry
- Metaheuristics: A Canadian Perspective
- A finite-capacity production scheduling procedure for a Belgian steel company
- Optimal torpedo scheduling
- Scheduling in a continuous galvanizing line
Uses Software
This page was built for publication: The hot strip mill production scheduling problem: A tabu search approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1609896)