Project scheduling under time dependent costs -- a branch and bound algorithm
DOI10.1023/A:1016046625583zbMATH Open0993.90056OpenAlexW163276831MaRDI QIDQ1610883FDOQ1610883
Authors: N. R. Achuthan, A. Hardjawidjaja
Publication date: 20 August 2002
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1016046625583
Recommendations
- New computational results on the discrete time/cost trade-off problem in project networks
- A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flows
- Scheduling of project networks
- Discrete time/cost trade-offs in project scheduling with time-switch constraints
- scientific article; zbMATH DE number 1594562
Management decision making, including multiple objectives (90B50) Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Approximation methods and heuristics in mathematical programming (90C59)
Cited In (7)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Heuristics for a project management problem with incompatibility and assignment costs
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- Project time-cost analysis under generalised precedence relations
- A new approach based on the surrogating method in the project time compression problems
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources
This page was built for publication: Project scheduling under time dependent costs -- a branch and bound algorithm
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1610883)