Two-stage hybrid flowshop scheduling with simultaneous processing machines
From MaRDI portal
Publication:1617273
DOI10.1007/S10951-017-0545-XzbMath1406.90048OpenAlexW2761748578MaRDI QIDQ1617273
Kai Huang, Tieke Li, Bailin Wang
Publication date: 7 November 2018
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-017-0545-x
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (3)
No-idle parallel-machine scheduling of unit-time jobs with a small number of distinct release dates and deadlines ⋮ A combined adaptive entropy‐TOPSIS and model predictive control strategy for mixed loading and delay operations in the reheating furnace ⋮ A systematic literature review on no-idle flow shop scheduling problem
Cites Work
- A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
- No-wait flexible flowshop scheduling with no-idle machines
- The flow shop problem with no-idle constraints: a review and approximation
- List scheduling in a parallel machine environment with precedence constraints and setup times
- The hybrid flow shop scheduling problem
- Optimal two- and three-stage production schedules with setup times included
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Unnamed Item
This page was built for publication: Two-stage hybrid flowshop scheduling with simultaneous processing machines