Packed parts delivery problem of automotive inbound logistics with a supplier park
From MaRDI portal
Publication:1628047
DOI10.1016/j.cor.2018.09.004zbMath1458.90370OpenAlexW2891858089MaRDI QIDQ1628047
Publication date: 3 December 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2018.09.004
Integer programming (90C10) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Uses Software
Cites Work
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
- Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
- Part logistics in the automotive industry: decision problems, literature review and research agenda
- Optimization of workcell layouts in a mixed-model assembly line environment
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem
- A column generation approach for the location-routing problem with time windows
- Scheduling in-house transport vehicles to feed parts to automotive assembly lines
- A technical review of column generation in integer programming
- Scheduling just-in-time part supply for mixed-model assembly lines
- A classification of assembly line balancing problems
- Packing items to feed assembly lines
- Vehicle Routing
This page was built for publication: Packed parts delivery problem of automotive inbound logistics with a supplier park