A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
DOI10.1016/J.COR.2018.09.008zbMATH Open1458.90361OpenAlexW2890470479WikidataQ129210690 ScholiaQ129210690MaRDI QIDQ1628053FDOQ1628053
Authors: M. van den Eeckhout, Broos Maenhout, Mario Vanhoucke
Publication date: 3 December 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://biblio.ugent.be/publication/8574283
Recommendations
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
- Resource-constrained project scheduling: A heuristic for the multi-mode case
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- PSPLIB -- a project scheduling problem library
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Staff scheduling and rostering: a review of applications, methods and models.
- Models and algorithms for a staff scheduling problem
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Integer programming to schedule a hierarchical workforce with variable demands
- The project scheduling problem with irregular starting time costs
- Personnel scheduling: a literature review
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- Scheduling trainees at a hospital department using a branch-and-price approach
- An evaluation of the adequacy of project network generators with systematically sampled networks
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Using mixed integer programming to design employee rosters
- Title not available (Why is that?)
- A Column Generation Approach for Large-Scale Aircrew Rostering Problems
- Efficient optimization of cyclic labor days-off scheduling
- The resource renting problem subject to temporal constraints
- Scheduling projects with heterogeneous resources to meet time and quality objectives
- Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Local search methods for the discrete time/resource trade-off problem in project networks
- Job-shop scheduling: Computational study of local search and large-step optimization methods
- An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- Solving software project scheduling problems with ant colony optimization
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
- The discrete time/cost trade-off problem: Extensions and heuristic procedures
- Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
- Project scheduling under time dependent costs -- a branch and bound algorithm
- Four-day workweek scheduling with two or three consecutive days off
- An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network
Cited In (11)
- Considering project management activities for engineering design groups
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce
- On the complexity of efficient multi-skilled team composition
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
- An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project
- A graph-based formulation for the shift rostering problem
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
Uses Software
This page was built for publication: A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1628053)