Constraint guided accelerated search for mixed blocking permutation flowshop scheduling
DOI10.1016/J.COR.2018.10.003zbMATH Open1458.90351OpenAlexW2897123348WikidataQ129106872 ScholiaQ129106872MaRDI QIDQ1628124FDOQ1628124
Authors: Vahid Riahi, M. A. Hakim Newton, Kaile Su, Abdul Sattar
Publication date: 3 December 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10072/382929
Recommendations
- Scheduling blocking flowshops with setup times via constraint guided and accelerated local search
- Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems
- New block properties for the permutation flow shop problem with application in tabu search
- A permutation-based neighborhood for the blocking job-shop problem with total tardiness minimization
- Branch-and-bound algorithm for solving blocking flowshop scheduling problems with makespan criterion
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Metaheuristics. From design to implementation.
- The Complexity of Flowshop and Jobshop Scheduling
- A comprehensive review and evaluation of permutation flowshop heuristics
- Benchmarks for basic scheduling problems
- New hard benchmark for flowshop scheduling problems minimising makespan
- A variable iterated greedy algorithm with differential evolution for the no-idle permutation flowshop scheduling problem
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- Some efficient heuristic methods for the flow shop sequencing problem
- Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems
- A three-phase algorithm for flowshop scheduling with blocking to minimize makespan
- Local search methods for the flowshop scheduling problem with flowtime minimization
- Optimal planning of part's machining on a number of machines
- NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness
- An iterated greedy algorithm with optimization of partial solutions for the makespan permutation flowshop problem
- Scheduling
- Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion
- Complexity of flowshop scheduling problems with a new blocking constraint
Cited In (6)
- Makespan preserving flowshop reengineering via blocking constraints
- Scheduling blocking flowshops with setup times via constraint guided and accelerated local search
- New idle time-based tie-breaking rules in heuristics for the permutation flowshop scheduling problems
- Improved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilization
- A new iterated greedy algorithm for no-idle permutation flowshop scheduling with the total tardiness criterion
- Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems
This page was built for publication: Constraint guided accelerated search for mixed blocking permutation flowshop scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1628124)