The multi-objective assembly line worker integration and balancing problem of type-2
From MaRDI portal
Publication:1652274
DOI10.1016/j.cor.2017.01.003zbMath1391.90225OpenAlexW2576376671WikidataQ56476081 ScholiaQ56476081MaRDI QIDQ1652274
Rafael Pastor, Alysson M. Costa, Cristóbal Miralles, Mayron César O. Moreira
Publication date: 11 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10251/143324
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (4)
Assembly line balancing: what happened in the last fifteen years? ⋮ A memetic algorithm for the cost-oriented robotic assembly line balancing problem ⋮ Modelling and a hybrid genetic algorithm for the equity-oriented worker assignment problem in seru production systems ⋮ Developing optimization \& robust models for a mixed-model assembly line balancing problem with semi-automated operations
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing
- Models for assembly line balancing by temporal, spatial and ergonomic risk attributes
- A heuristic and a branch-and-bound algorithm for the assembly line worker assignment and balancing problem
- Model and heuristics for the assembly line worker integration and balancing problem
- An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II
- On solving the assembly line worker assignment and balancing problem via beam search
- Simultaneous optimization of classical objectives in JIT scheduling
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Heuristics and exact algorithms for solving the Monden problem
- A branch-and-bound algorithm for assembly line worker assignment and balancing problems
- Minimizing variation of production rates in just-in-time systems: A survey
- A classification of assembly line balancing problems
- Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- A survey on problems and methods in generalized assembly line balancing
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis
- Applications of Multi-Objective Evolutionary Algorithms
- A Production Line that Balances Itself
- A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem
This page was built for publication: The multi-objective assembly line worker integration and balancing problem of type-2