An exact algorithm for the bi-objective timing problem
From MaRDI portal
Publication:1653286
DOI10.1007/S11590-018-1237-YzbMATH Open1403.90608DBLPjournals/ol/JacquinDJ18OpenAlexW2788193379WikidataQ59262649 ScholiaQ59262649MaRDI QIDQ1653286FDOQ1653286
Authors: Sophie Jacquin, Fanny Dufossé, Laetitia Jourdan
Publication date: 3 August 2018
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-018-1237-y
Recommendations
- scientific article; zbMATH DE number 6378894
- An exact algorithm for biobjective integer programming problems
- Exact algorithms for the imbalanced time minimizing assignment problem
- An algorithm for construction of optimal timing solutions in problems with a stochastic payoff function
- Algorithms for time-dependent bicriteria shortest path problems
- On the optimality of exact and approximation algorithms for scheduling problems
- An efficient time algorithm for makespan objectives
- An approximation scheme for the bi-scenario sum of completion times trade-off problem
- Approximation Algorithms for Scheduling Problems with Exact Delays
- Approximation algorithms for time constrained scheduling
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Multicriteria optimization
- A dynamic-programming-based exact algorithm for general single-machine scheduling with machine idle time
- Hybridization of harmony search with variable neighborhood search for restrictive single-machine earliness/tardiness problem
- Bicriteria Transportation Problem
- A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem
- Iterated local search based on multi-type perturbation for single-machine earliness/tardiness scheduling
- Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs
- Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
- Minimizing the earliness--tardiness costs on a single machine
- An improved earliness--tardiness timing algorithm
- Piecewise linear multicriteria programs: the continuous case and its discontinuous generalization
- The one-machine just-in-time scheduling problem with preemption
- Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness
- Multicriteria models for just-in-time scheduling
Cited In (1)
This page was built for publication: An exact algorithm for the bi-objective timing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1653286)