Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times
From MaRDI portal
Publication:1665637
Recommendations
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times
- Heuristic algorithms for the two-stage hybrid flowshop problem
- Algorithms for a realistic variant of flowshop scheduling
- Scheduling a two-stage hybrid flowshop with separable setup and removal times
Cites work
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
- Johnson's rule, composite jobs and the relocation problem
- Optimal two- and three-stage production schedules with set-up time included
- Optimization by Simulated Annealing: An Experimental Evaluation; Part I, Graph Partitioning
- Optimization by simulated annealing
- Scheduling flexible flow lines with sequence-dependent setup times
- The hybrid flow shop scheduling problem
- Two-Stage, Hybrid Flowshop Scheduling Problem
Cited in
(10)- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time
- A data intensive heuristic approach to the two-stage streaming scheduling problem
- Advances in Neural Networks – ISNN 2005
- Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal
- A computational study of heuristics for two-stage flexible flowshops
- A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times
- Algorithms for a realistic variant of flowshop scheduling
- Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping
This page was built for publication: Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1665637)