Theoretical expectation versus practical performance of Jackson's heuristic
From MaRDI portal
Publication:1665791
DOI10.1155/2015/484671zbMath1394.90308OpenAlexW2104014624WikidataQ59118707 ScholiaQ59118707MaRDI QIDQ1665791
Lester Carballo, Nodari Vakhania, Dante Pérez
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/484671
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Theoretical and practical issues in single-machine scheduling with two job release and delivery times ⋮ Scheduling a single machine with primary and secondary objectives
Cites Work
- Unnamed Item
- Minimizing maximum lateness of jobs with naturally bounded job data on a single machine in polynomial time
- A study of single-machine scheduling problem to maximize throughput
- Single-machine scheduling with release times and tails
- Parallel batch scheduling of equal-length jobs with release and due dates
- Improving the preemptive bound for the single machine dynamic maximum lateness problem
- Jackson's semi-preemptive scheduling on a single machine
- Scheduling jobs with release times preemptively on a single machine to minimize the number of late jobs
- A block approach for single-machine scheduling with release dates and due dates
- The one-machine sequencing problem
- Jackson's pseudo preemptive schedule for the \(Pm/r_i, q_i/C_{\text{max}}\) scheduling problem
- Parallel branch-and-bound methods for the job-shop scheduling problem
- Concurrent operations can be parallelized in scheduling multiprocessor job shop
- Branch less, cut more and minimize the number of late equal-length jobs on identical machines
- Multiprocessor Scheduling of Unit-Time Jobs with Arbitrary Release Times and Deadlines
- An Algorithm for Solving the Job-Shop Problem
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
- Scheduling Unit–Time Tasks with Arbitrary Release Times and Deadlines
- Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better
- On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A better algorithm for sequencing with release and delivery times on identical machines
- A Fast Algorithm for Multiprocessor Scheduling of Unit-Length Jobs
- Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case
- On sequencing with earliest starts and due dates with application to computing bounds for the (n/m/G/Fmax) problem
- Solving open benchmark instances for the job-shop problem by parallel head-tail adjustments
This page was built for publication: Theoretical expectation versus practical performance of Jackson's heuristic