Modeling spare parts demands forecast under two-dimensional preventive maintenance policy
From MaRDI portal
Publication:1666448
DOI10.1155/2015/728241zbMATH Open1394.90225OpenAlexW2057616284WikidataQ59119064 ScholiaQ59119064MaRDI QIDQ1666448FDOQ1666448
Authors: Qiwei Hu, Yongsheng Bai, Jianmin Zhao, Wenbin Cao
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/728241
Recommendations
- Failure replacement and preventive maintenance spare parts ordering policy
- A two-step method for forecasting spare parts demand using information on component repairs
- Joint optimization of preventive maintenance and spare parts inventory with appointment policy
- A stochastic model for joint spare parts inventory and planned maintenance optimisation
- A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times
Cites Work
- Failure replacement and preventive maintenance spare parts ordering policy
- Two-dimensional failure modeling with minimal repair
- Optimum Solution Structure for a Repairable Inventory Problem
- Title not available (Why is that?)
- A stocking policy for spare part provisioning under age based preventive replacement
- Base stock level determination for high cost low demand critical repairable spares
- Optimal algorithm to determine the spare inventory level for a repairable-item inventory system
- Two-dimensional warranty repair strategy based on minimal and complete repairs
- A stochastic model for joint spare parts inventory and planned maintenance optimisation
- Alternative time scales and failure time models
- Two-dimensional warranty cost analysis for second-hand products
Cited In (3)
- A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times
- Availability optimization of multicomponent products with economic dependence under two-dimensional warranty
- Spare parts classification in industrial manufacturing using the dominance-based rough set approach
This page was built for publication: Modeling spare parts demands forecast under two-dimensional preventive maintenance policy
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1666448)