Modeling spare parts demands forecast under two-dimensional preventive maintenance policy
From MaRDI portal
Publication:1666448
DOI10.1155/2015/728241zbMath1394.90225OpenAlexW2057616284WikidataQ59119064 ScholiaQ59119064MaRDI QIDQ1666448
Yongsheng Bai, Qiwei Hu, Wenbin Cao, Jianmin Zhao
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/728241
Related Items
Spare parts classification in industrial manufacturing using the dominance-based rough set approach, Availability optimization of multicomponent products with economic dependence under two-dimensional warranty
Cites Work
- Unnamed Item
- A stochastic model for joint spare parts inventory and planned maintenance optimisation
- A stocking policy for spare part provisioning under age based preventive replacement
- Base stock level determination for high cost low demand critical repairable spares
- Alternative time scales and failure time models
- Failure replacement and preventive maintenance spare parts ordering policy
- Optimal algorithm to determine the spare inventory level for a repairable-item inventory system
- Two-dimensional warranty repair strategy based on minimal and complete repairs
- Two-Dimensional Warranty Cost Analysis for Second-Hand Products
- Two-dimensional failure modeling with minimal repair
- Optimum Solution Structure for a Repairable Inventory Problem