The coupled unit-time operations problem on identical parallel machines with respect to the makespan
From MaRDI portal
(Redirected from Publication:1667166)
Recommendations
- The two-machine open-shop problem with unit-time operations and time delays to minimize the makespan
- Two-machine flowshop scheduling problem with coupled-operations
- An improved approximation algorithm for the coupled-task scheduling problem with equal exact delays
- Approximation algorithms for coupled task scheduling minimizing the sum of completion times
- Minimizing makespan subject to minimum total flow-time on identical parallel machines
Cites work
- A note on scheduling identical coupled tasks in logarithmic time
- An exact algorithm for scheduling identical coupled tasks
- Complexity results for single-machine problems with positive finish-start time-lags
- Heuristics for a coupled-operation scheduling problem
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Polynomial-time algorithms for scheduling problem for coupled-tasks in presence of treatment tasks
- Scheduling for a multifunction phased array radar system
- Scheduling of coupled tasks and one-machine no-wait robotic cells
- Scheduling of coupled tasks with unit processing times
Cited in
(5)- Two-machine flowshop scheduling problem with coupled-operations
- FPTAS for the two identical parallel machine problem with a single operator under the free changing mode
- Parallel machine scheduling with a simultaneity constraint and unit-length jobs to minimize the makespan
- Minimizing total completion time on parallel machines with unit length jobs that need one additional resource
- The two-machine open-shop problem with unit-time operations and time delays to minimize the makespan
This page was built for publication: The coupled unit-time operations problem on identical parallel machines with respect to the makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1667166)